    • Responsible for Capital Budget preparation and space planning, short and long term Master Plan
       
    • Coordinate Capital Projects with the Dormitory Authority of the State of New York, City University of New York, the New York Power Authority as well as various government agencies regarding College facilities
       
    • Coordinate with project design architects and engineers to achieve completion of projects on-time, to ensure construction safety on campus and that construction projects are in compliance with design drawings and specifications
       
    • Responsible for space inventory, campus-wide ADA adherence, and energy management program
       
    • Serve as Pre-Engineering Audit Officer for the Controller's Office of the City of New York to ensure the completion of projects in compliance with design specification
       
    • Resource center of the college community, especially for groups such as Building Operations, Facilities Design and Construction, the Division of Information Technology, and the College's 504/ADA Committee
       
    • Responsible for all code compliance, violation clearances, mechanical, electrical, fire protection and plumbing design changes and reviews
  •  Current Capital Projects (as of 18/03/2013)
    1. Center 3 Admission and Bursar Offices
    Architect: APA Architects
    Engineer: Kallen & Lemelson
    Construction Manager: URS Corporation
    General Contractor: DNB Builders.
    Mechanical Contractor: Planet Mechanical Corp.
    Electrical Contractor: MSR Electrical Corp.
    Status:Construction was completed.  

    2. Center 3 Façade Renovation
    Architect: Mitchell Giurgola Architects
    Status: Design in Progress
     
    3. College-Wide Streetscape Improvement
    Architect: Lee Weintraub Landscape Architecture, LLC
    Status: Construction in Progress.

    4. C Building Solar Voltaic
    Construction Manager: DASNY
    Design Build Contractor: O'Brien & Gere
    Status: Design in progress

    5. Center 3  8th Floor and Infrastructure
    Architect: Mitchell Giurgola
    Engineer: Joseph Loring
    Status: Awaiting fund for construction.

    6. Library Expansion
    Architect: Gruzen Samton Architect
    Engineer: Joseph Loring
    Status:  Design in progress

    7. Roofing Repair
    Architect: Superstructures Engineers and Architects
    Status: Design in progress

    8. C Building Boiler Replacement
    Engineer: Genesys Engineering
    Status: Pending on contract award.

    9. Humanities Department Relocation
    Architect: APA architect
    Status: Design in Progress.

    10. Goldman Sachs Ten Thousands Small Business
    Architect: Steven Ely Architect
    Status:  Pending on funding.

     Staff
    Richard Ng, Director
    RICHARDN@lagcc.cuny.edu
    718-482-5572

    Salim Djari, Assistant Engineer
    sdjari@lagcc.cuny.edu
    718-482-5574

    Patricia McIntosh, Office Assistant
    pmcintosh@lagcc.cuny.edu
    718-482-5575

    Marcelo Genao, College Assistant
    magenao@lagcc.cuny.edu
    718-482-5223
  • Academic Calendar Thumbnail
    Academic Calendar

  • Class Schedules

LaGuardia Community College LaGuardia Community College 31-10 Thomson Ave. Long Island City, NY 11101 LaGuardia Community College 1-718-482-7200 LaGuardia Community College Map & Directions
Copyright © All Rights Reserved